It's that time when most of the big stuff is done, particularly on the outside of the house. It's also the time when most of the stuff that is being worked on is on the inside--the wiring, the plumbing, the insulation, the drywall, the painting, the moving in.
Ok, ok, I'm getting a little ahead of myself.
But the wiring is almost done, the plumbing is roughed in and the insulation will be going in next week.
So in lieu of closeups of wires and pipes, I'll stretch what little credibility I have to show you some of the things still going on on the outside.
Well, there's some new posts on the front porch.
When do the shingles go on?
ReplyDeleteMetal roof over bump out was put on today.
ReplyDeleteInsulation and shingles next week.
I hope the new house is "Hodag proof"