I can't say I wasn't warned about this, because I was.
It's that time when most of the big stuff is done, particularly on the outside of the house. It's also the time when most of the stuff that is being worked on is on the inside--the wiring, the plumbing, the insulation, the drywall, the painting, the moving in.
Ok, ok, I'm getting a little ahead of myself.
But the wiring is almost done, the plumbing is roughed in and the insulation will be going in next week.
So in lieu of closeups of wires and pipes, I'll stretch what little credibility I have to show you some of the things still going on on the outside.
Well, there's some new posts on the front porch.
And some of the detail work on those posts has been completed.
Follow along as we design and build a house. Wild and dangerous curves ahead on this ride. Seatbelts required.
Wednesday, September 30, 2009
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
-
▼
2009
(99)
-
▼
September
(17)
- It Was the Best of Times; It Was the Worst of Times
- A Post About Posts (And Some Other Stuff)
- Stucco and Ducks
- Lots O' Activity Today
- Our Staining Job Makes Its Debut
- My Mind is Cluttered with (Not So) Worthless Infor...
- Your Assistance Once Again is Requested
- Plugging Along
- Kurt Attempts Theft of Natural Resources
- Stains 'R Us
- Walnut (#9) Wins Out
- A Stain on Us All
- The First (and Only) Pick a Stain Contest
- One of the guys, Jay, pulled up sick today after t...
- 'Swindows!
- Progressives in the House
- It's a Wrap, Tyvek Wrap
-
▼
September
(17)
When do the shingles go on?
ReplyDeleteMetal roof over bump out was put on today.
ReplyDeleteInsulation and shingles next week.
I hope the new house is "Hodag proof"
ReplyDelete