After dodging raindrips and drops the past few weeks, sometime successfully, usually not, the roof has that underlayment (overlayment?) on it which should keep things relatively dry inside. The weather forecast for the next week? Sunny and mild.
Scaffolding stands at the ready to help with the last exterior plywood to be installed. (See below.)
The exterior cedar is ready for staining; stain to follow.
The view from the kitchen area takes shape.
The downstairs bath also takes shape.
And the face of the house also approaches enclosure.
What is the white stuff covering the plywood roof decking ?
ReplyDelete