Wednesday, October 21, 2009

One Day Drywall; the Next Day HEAT

From the Master Bedroom to the bath (l) and closet (r).
A peek at both floors.

The little heater in the kitchen area provided a comfortable temperature.
Today the electric company (finally) hooked up the meter allowing for light and heat inside. The insulation guys returned to insulate the ceilings now that the drywall is up. The shingles were delivered and the stone was ordered for the exterior.
Additionally the floor samples arrived; the landscaper made some initial design impressions and some other stuff happened that I have forgotten about because my head's spinning.
It looks like my buddy and I will be doing some interior staining this weekend because some more posts arrived.


2 comments:

  1. What did they do to maintain the ventilation between the insulation and roof deck in the slanted areas that they blew from the attic?
    Or were those filled because there was no intake?

    ReplyDelete
  2. Yup, they were filled because the house has an air exchange.

    ReplyDelete