. . . more like doing the outside stuff while the temperature is above freezing. There's stucco to finish, nailing up cedar, and putting up the rock that is to arrive tomorrow.
The Durock is ready to receive it and, I'm not going to miss that pink around the base of the house.
The sand at the east end of the house has been moved about 23 times I believe.
Follow along as we design and build a house. Wild and dangerous curves ahead on this ride. Seatbelts required.
Thursday, October 29, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment