Is this even possible? After all the wrangling with banks/insurance/FEMA/etc. etc. etc. that we are ahead of schedule? According to Charlie, we are. And according to the timeline he provided, we are.
Ann called it correctly. When we pondered whether to undertake this adventure she said that the time was right--interest rates were low; folks needed work; the best builders had no waiting. And all those things turned out to be true. Charlie's company has only this project that's active whereas normally they have five at a time and a waiting list to boot.
The ability to devote resources and attention to one job is to our benefit as well as his.
From the river.
Ann and Lyle discuss all things septic (tanks that is).
Looking south down the drive.
Supervision (maybe that's why we're ahead of schedule.)
The basement foam readies itself for the in-floor radiant heating system.
No comments:
Post a Comment